top of page
derriford research facility
plymouth
A full design and installation on a new build project.
The levels of roof required two systems which meant only two down pipes discharging to one location for storm drainage, therefore reducing the groundworks requirement.
A flexible system was used with an acoustic insulated wrap installed with fire stops mounted above the suspended ceiling.
bottom of page