derriford research facility

plymouth

A full design and installation on a new build project. 

 

The levels of roof required two systems which meant only two down pipes discharging to one location for storm drainage, therefore reducing the groundworks requirement.

 

A flexible system was used with an acoustic insulated wrap installed with fire stops mounted above the suspended ceiling.